Location: Winnipeg, MB
Year: 2015
Cost: $8,500,000
This facility is composed of an outdoor spa complex, a golf clubhouse, a storage garage and associated
site works. The total square footage of the buildings is approximately 10,000sqft. The project includes
multiple pools and was built within the flood fringe and land was cut and filled to raise the complex,
leaving water features in the form of retention ponds on site. There is also a full basement on 70% of
the complex.
LDA was responsible for the structural design and preparation of the contract working drawings for the
complex. We also provided construction phase services including job site inspections and final
certification upon completion.